2016, Small HPP Dębowy Gaj, the Bóbr River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the Small HPP on the Bóbr River in Dębowy Gaj
Location:
Bóbr River, Dębowy Gaj, Poland
Date:
April 2016
Aim:
Fish protection against entering to the hydro power plant turbines.
Installation parameters – Type: NEPTUN
- Barrier length: 10 m
- Electrodes length: 1.4 m
- Electrodes mounting: to the bottom
- Power supply: 1-phase