2016, Small HPP Dębowy Gaj, the Bóbr River, Poland

Implementation details

Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the Small HPP on the Bóbr River in Dębowy Gaj

Location:
Bóbr River, Dębowy Gaj, Poland

Date:
April 2016

Aim:
Fish protection against entering to the hydro power plant turbines.

Installation parameters – Type: NEPTUN

  • Barrier length: 10 m
  • Electrodes length: 1.4 m
  • Electrodes mounting: to the bottom
  • Power supply: 1-phase