2016, Nysa, the Nysa reservoir, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper and lower dam embankment in the Nysa water reservoir, the Nysa Kłodzka River in Nysa
Location:
Nysa Kłodzka River, Nysa, Poland
Date:
October 2016
Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass.
Effectiveness verification: 79% – 99%
Installation parameters – Upper Water – Type: NEPTUN
- Barrier length: 60 m
- Electrodes length: up to 9 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase
Installation parameters – Lower Water – Type: NEPTUN
- Barrier length: 110 m
- Electrodes length: up to 4 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase