2020, weir Januszkowice, the Odra River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper and lower water of the HPP Januszkowice, the Odra River in Januszkowice
Location:
Odra River, Januszkowice, Poland
Date:
November 2020
Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass.
Installation parameters – Upper Water- Type: NEPTUN
- Barrier length: 50 m
- Electrodes lengt: 2,8 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase
Installation parameters – Lower Water – Type: NEPTUN
- Barrier length: 19 m
- Electrodes lengt: 2,6 m
- Electrodes mounting: to the bottom