2016, HPP Nysa, the Nysa Kłodzka River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper and lower water of the HPP Nysa, the Nysa Kłodzka River in Nysa
Location:
Nysa Kłodzka River, Nysa, Poland
Date:
December 2016
Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass.
Installation parameters – Upper Water- Type: NEPTUN
- Barrier length: 26 m
- Electrodes length: 3,5 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase
Installation parameters – Lower Water – Type: NEPTUN
- Barrier length: 19 m
- Electrodes length: 2 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase