2016, HPP Nysa, the Nysa Kłodzka River, Poland

Implementation details

Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper and lower water of the HPP Nysa, the Nysa Kłodzka River in Nysa

Location:
Nysa Kłodzka River, Nysa, Poland

Date:
December 2016

Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass.

Installation parameters – Upper Water- Type: NEPTUN

  • Barrier length: 26 m
  • Electrodes length: 3,5 m
  • Electrodes mounting: to the bottom
  • Power supply: 3-phase

Installation parameters – Lower Water – Type: NEPTUN

  • Barrier length: 19 m
  • Electrodes length: 2 m
  • Electrodes mounting: to the bottom
  • Power supply: 3-phase