2015, HPP Wrocław I, the Odra River, Poland

Implementation details

Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the lower water of the HPP Wrocław I on the Odra River in Wrocław

Location:
Odra River, Wrocław, Poland

Date:
October 2015

Aim:
Fish protection against entering to outlet chanel of the hydro power plant turbines and directing to the fish passes.

Effectiveness verification: 96%

Installation parameters – Type: NEPTUN

  • Barrier length: 36 m
  • Electrodes length: 3.5 m
  • Electrodes mounting: to the bottom
  • Power supply: 3-phase