2015, HPP Wrocław I, the Odra River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the lower water of the HPP Wrocław I on the Odra River in Wrocław
Location:
Odra River, Wrocław, Poland
Date:
October 2015
Aim:
Fish protection against entering to outlet chanel of the hydro power plant turbines and directing to the fish passes.
Effectiveness verification: 96%
Installation parameters – Type: NEPTUN
- Barrier length: 36 m
- Electrodes length: 3.5 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase