2016, Niedów, the Witka River, Poland

Implementation details

Project name
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water in the Niedów reservoir.

Location:
Witka River, Niedów, Poland

Date:
December 2016

Aim:
Fish protection against entering to the hydro power plant turbines and water pumps.

Installation parameters – Type: NEPTUN

  • Barrier length: 32 m
  • Electrodes length: 9,5 m
  • Electrodes mounting: to the bottom
  • Power supply: 3-phase