2016, Niedów, the Witka River, Poland
Implementation details
Project name
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water in the Niedów reservoir.
Location:
Witka River, Niedów, Poland
Date:
December 2016
Aim:
Fish protection against entering to the hydro power plant turbines and water pumps.
Installation parameters – Type: NEPTUN
- Barrier length: 32 m
- Electrodes length: 9,5 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase