2016, HPP Turawa, the Turawa Lake, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the HPP Turawa, Turawa Lake
Location:
Turawa Lake, Turawa, Poland
Date:
December 2016
Aim:
Fish protection against entering to the hydro power plant turbines.
Installation parameters – Type: NEPTUN
- Barrier length: An innovative solution specially designed for this shot has been applied
- Electrodes length: 6 m
- Power supply: 3-phase