2016, HPP Turawa, the Turawa Lake, Poland

Implementation details

Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the HPP Turawa, Turawa Lake

Location:
Turawa Lake, Turawa, Poland

Date:
December 2016

Aim:
Fish protection against entering to the hydro power plant turbines.

Installation parameters – Type: NEPTUN

  • Barrier length: An innovative solution specially designed for this shot has been applied
  • Electrodes length: 6 m
  • Power supply: 3-phase