2015, Veytau, the Geneva Lake, Switzerland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system, Geneva Lake in Veytau, Switzerland
Location:
Geneva Lake, Switzerland
Date:
October 2015
Aim:
Fish protection against entering to the hydro power plant turbines.
Installation parameters – Type: NEPTUN
- Barrier length: 70 m
- Electrodes length: 6-13 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase