2015, HPP Smolice, the Vistula River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the HPP Smolice on the Vistula River
Location:
Vistula River, Smolice, Poland
Date:
March 2015
Aim:
Fish protection against entering to the hydro power plant turbines.
Installation parameters – Type: NEPTUN
- Barrier length: 60 m
- Electrodes length: 3.5 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase