2015, HPP Smolice, the Vistula River, Poland

Implementation details

Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the HPP Smolice on the Vistula River

Location:
Vistula River, Smolice, Poland

Date:
March 2015

Aim:
Fish protection against entering to the hydro power plant turbines.

Installation parameters – Type: NEPTUN

  • Barrier length: 60 m
  • Electrodes length: 3.5 m
  • Electrodes mounting: to the bottom
  • Power supply: 3-phase