2014, Small HPP Koźle, the Odra River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the Small HPP Koźle on the Odra River in Kędzierzyn-Koźle
Location:
Odra River, Kędzierzyn-Koźle, Poland
Date:
June 2014
Aim:
Fish protection against entering to the hydro power plant turbines.
Installation parameters – Type: NEPTUN
- Barrier length: 60 m
- Electrodes length: 3.5 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase