2014, Small HPP Koźle, the Odra River, Poland

Implementation details

Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the Small HPP Koźle on the Odra River in Kędzierzyn-Koźle

Location:
Odra River, Kędzierzyn-Koźle, Poland

Date:
June 2014

Aim:
Fish protection against entering to the hydro power plant turbines.

Installation parameters – Type: NEPTUN

  • Barrier length: 60 m
  • Electrodes length: 3.5 m
  • Electrodes mounting: to the bottom
  • Power supply: 3-phase