2013, UHE Jirau, the Madeira River, Brazil
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN control cabinet in Turbine 29
Effectiveness verification: 99%
Location:
UHE Jirau, Rod br s/n km 824 – Distrito Jaci-Parana – Porto Velho (ro)
Brazil
Date:
August 2013