2021, the Teles Pires River, Brazil
Implementation details
Scope:
Delivery, installation and commissioning of the NEPTUN fish protection system along with testing its effectiveness on the lower water of the hydroelectric power plant.
Location:
Brazil, Distrito Mato Grosso, Teles Pires River
Date of commissioning:
01.2021
Objective:
Protection of fish from entering the outlet channels of the hydroelectric power plant.
Installation parameters
- Type: NEPTUN
- Barrier length: right side 116 m, left side 116 m.
- Electrode length: up to 20 m.
- Method of attaching electrodes: to floating modules.
- Effectiveness: right side 90%, left side 73%.