2019, HPP Grands Malades, the Moza River, Belgium
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the HPP Grands Malades on the Moza River in Namur
Location:
Moza River, Namur, Belgium
Date:
October 2019
Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass
Installation parameters – Type: NEPTUN
- Barrier length: 36 m
- Electrodes length: up to 8 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase