2018, Small HPP Lipki, the Odra River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the Small HPP Lipki on the Odra River in Lipki
Location:
Odra River, Lipki, Poland
Date:
January 2018
Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass
Installation parameters – Type: NEPTUN
- Barrier length: 36 m
- Electrodes length: 4,0 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase