2018, Small HPP Lipki, the Odra River, Poland

Implementation details

Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the Small HPP Lipki on the Odra River in Lipki

Location:
Odra River, Lipki, Poland

Date:
January 2018

Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass

Installation parameters – Type: NEPTUN

  • Barrier length: 36 m
  • Electrodes length: 4,0 m
  • Electrodes mounting: to the bottom
  • Power supply: 3-phase