2017, HPP Płoty, the Rega River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the HPP Płoty on the Rega River in Płoty
Location:
Rega River, Płoty, Poland
Date:
September 2017
Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass.
Effectiveness verification: 90% – 100%
Installation parameters – Type: NEPTUN
- Barrier length: 35 m
- Electrodes length: up to 2,5 m
- Electrodes mounting: to the bottom
- Power supply: 1-phasy