2017, HPP Płoty, the Rega River, Poland

Implementation details

Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper water of the HPP Płoty on the Rega River in Płoty

Location:
Rega River, Płoty, Poland

Date:
September 2017

Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass.

Effectiveness verification: 90% – 100%

Installation parameters – Type: NEPTUN

  • Barrier length: 35 m
  • Electrodes length: up to 2,5 m
  • Electrodes mounting: to the bottom
  • Power supply: 1-phasy