2017, HPP Rejowice, the Rega River, Poland
Implementation details
Project name:
Supply, installation and initiation of the NEPTUN fish behaviour management system on the upper and lower water of the HPP Rejowice, the Rega River in Rejowice
Location:
Rega River, Rejowice, Poland
Date:
September 2017
Aim:
Fish protection against entering to the hydro power plant turbines and directing to the fish pass.
Effectiveness verification: 87% – 100%
Installation parameters – Upper Water- Type: NEPTUN
- Barrier length: 33 m
- Electrodes lengt: 6 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase
Installation parameters – Lower Water – Type: NEPTUN
- Barrier length: 43 m
- Electrodes lengt: 2 m
- Electrodes mounting: to the bottom
- Power supply: 3-phase