At the end of December 2018, the installation of the NEPTUN systems at the intake and outlet in Hydro Power Station Malczyce on the Odra River was completed.
On the upper water purpose of the barrier is a protect the fish from entering the turbines of the hydroelectric plant
On the lower water purpose is a directing the fish to the fish pass.
In addition, as part of this task, we have delivered and installed two a fish monitoring systems in the fish pass. The task of the monitoring system is counting, indication of flow direction, dimensioning and recording of video image of the flowing fish.