2012, Jirau Power Station, the Madeira river, Brazil

Inspections details


Project name:
Implementation evaluation of the Neptun electric and electronic barrier to be used in order to reduce the fish flow to turbine chambers in JIRAU Power Plant, Energia Sustentavel Do Brasil.

Place of testing:
Jirau Power Station, the Madeira River, Brazil

Date of testing:
11.2012

Effectiveness:
99,88%